Creekview High School

Carrollton-Farmers Branch ISD

Project Overview

In 2021 EMA's SOLVE team provided HVAC Design and Commissioning services for CFB ISD's Creekview High School. This project included designing one of the largest Variable Refrigerant Flow (VRF) systems in a K-12 building in Texas. A total of 402 tons of VRF were installed in the building. The scope of work also included a full HVAC equipment replacement and conversion of an existing hydronic system to a DX RTU (Roof-top Unit) and VRF system.


Design Features:

- To achieve the Owner's desired result, the existing hydronic (chilled water and hot water) system was converted to an entirely new system; over 400 tons of VRF equipment were installed on the first and second floors of Creekview High School.

- EMA also incorporated air scrubbers, an advanced technology used to remove volatile organic compounds (VOC), contaminates, and human-generated CO2, to aid CFB ISD in improving the facility's indoor air quality.

Location

Location

Carrollton, TX

Size

Size

400,000 SF

Cost

Cost

$6.9 Million (HVAC system cost only)

Project Type

Project Type

Additions & Renovations

Services Provided

Services

HVAC Design, Commissioning

© 2024 EMA Engineering & Consulting, Inc. | Employee Privacy Policy
Responsive Website by GroupM7 Design™