EMA provided MEP Design and construction administration for the expansion of approximately 7,000 square feet for the existing surgery suite at Overton Brooks VA Medical Center. The expansion included a 300 Ton chilled water system with auxiliary connection to hospital central plant. Additionally, the design also included HVAC, smoke removal, lighting, the addition of a complete fire alarm/fire sprinkler systems, medical gas and vacuum systems, essential electrical systems, isolated power in operating rooms, and new plumbing systems.
Shreveport, LA
7,000 SF
$3.4 Million
Additions & Renovations
MEP Design, Construction Administration